top of page

Major Projects

Flameout Inside 9&10.jpg

•    SASOL NORTH AMERICA Bulk Firefighting Equipment (Above and Underground) Custom Fabricated Monitors & Towers 2016

 

•    BP Pipelines North America 2007 – 2010. Contracted to engineer &specify equipment for all North American Terminals and logistics sites. Contract winding down as BP to sell off Terminals. Numerous HAZID’s (consultant BP)

 

•    Chevron TCO fire systems overhaul. Tengiz Kazakhstan 2007-2008 Traveled to Facility and made plant survey for Chevrons largest production facility. Worked with local engineers of map lost areas of the system and perform hydraulic studies using KY pipe.

•    Chevron Escravos Gas to Liquids 2005 – 2007 Fire protection engineer and hydraulics coordinator. HAZOP, HAZID, 3D model review. (KBR and then employed by Chevron on the project side)

 

•    Chevron LNG Terminals projects – Port Pelican, Baja, and others as a consultant to Fluor 2004 – 2005 (Fluor)

 

•    Chevron Texaco: Okan – Escravos  Nigeria 5000 PSI Gas well head platform 2004

 

•    Chevron Texaco: Meji - Escravos Nigeria 2004 Gas compression platform. Integrated Fire and Gas detection 2004(Aker Kvaerner)

 

•    Freeport Mc Moran: Permits to Coast Guard March 2004. Offshore LNG offloading, vaporization, and Cavern Storage of vaporized natural gas 2003. High Expansion Foam Systems, Deluge and all other Safety related specifications and equipment (Aker Kvaerner)

 

•    Methonex: Methanol Syn-Gas facilities Australia .Australian Fire Codes 2003(Aker Kvaerner)

 

 •   ExxonMobil:  Adriatic LNG Terminal - High Expansion foam, FRP fire water and Deluge Systems, TMR fire and Gas detection systems 2003-2004 RINA and IEC codes. (Aker Kvaerner)

 

•    Q-Chem II: Fire water, Foam and Fire gas systems for Poly Ethylene & Normal Alpha Oliphans, & Tank Farm 2003-2004 (Aker Kvaerner)

 

•    Foam systems for over 23 heli-decks on offshore drilling rigs.

 

•    Petrobraes P-19, P-21, P-34, P-47 FPSO (Mustang Eng. And MODEC)

 

•    Exxon Baytown BTGP facility evaluations 2003

 

•    Edison LNG offshore Terminal Deluge, Foam, CO2 and Gas detection 2002-2003(Aker Kvaerner)

 

•    Kuwait Oil Company Integrated fire protection system for calm buoys and onshore Storage Facilities. 2002 (Aker Kvaerner)

 

•    Chevron Sanha Fire Systems Evaluation 2002 (Kaldair/Chevron)

 

•    Developed first fire fighting training school in Pakistan 1989 (Occidental)

 

•    worked during “Desert storm” in Saudi and Kuwait developing systems for Bechtel/KOC 1990-1992 (Bechtel)

 

•    Hibernia Platform 1993-1994 flare gas studies and suppression (KBR)

 

•    Designed & implemented  largest High Expansion foam system in the world for Sonatrach LNG Algeria 1994 (ANGUS/KBR)

 

•    Developed foam protection systems for Saudi Air force in hardened nuclear Tornado fighter hanger facilities. 1993 (Thorne Security)

 

•    First American F&S systems engineer designing systems in  Azerbaijan for Pennzoil Caspian Corporation (2 year contract) 1993-1995

 

•    Designed & implemented fully remote foam systems for Shell Capsa after Buenos Aires harbor fire.1992 (Contract Shell)

 

•    Designed infrared camera detection & suppression system for Mecca (4 sq. miles) using PLC and GPS 1995-1996 (Chemguard)

 

•    Deluge systems design and fabrication Chevron Escravos 1996 on and offshore (FRP) (Lummus Crest)

 

•    Developed first governmental specifications for the Government of Guatemala regarding the protection of tank farms and loading terminals. (Consulted and regulated (Texaco, ESSO, Shell, and Copensa)

 

•    CO2 systems for Chevron West Africa 1998 & Venezuela (KBR)

 

•    Diana Platform foam systems Exxon/Mobil (KBR)

 

•    Exxon BOP-X Baytown fire water monitor systems (KBR)

 

•    FRP Piping systems K-WIP Chevron Venezuela 1998 (KBR)

 

•    Foam systems and FRP piping Sable Offshore (ABB Lummus)

 

•    Feed package for Sakhalin Islands Deluge and Foam systems (ABB Lummus) 2002

 

•    FRP Piping systems for Chevron Cabinda in West Africa and Venezuela 1998

  

•    Designed, Engineered, Fabricated & received governmental approvals for electric RC fire water monitors Kadansk Poland  1998 (Chubb)

 

•    Grass roots Integrated Foam, Deluge,  Occidental 2002 (Universal Ensco)

Major Projects

IMG_1045.JPG
Occidental/Johnson Controls 2023

Assembly of Oscillating Deluge Monitors for OXY in West Texas x

IMG_1045.JPG
Phillips 66 Lake Charles La.
2013

Flameout Design and Fabrication LLC has designs and custom manufactured equipment on offshore rigs, gas processing plants, and production wells throughout the oil patch around the world. We can engineer

National Foam / Treeker Abu Dhabi
2016
National Foam / Treeker Abu Dhabi
2016
Resized_20201216_143218.jpg
National Foam / Treeker Abu Dhabi
2016
Screen Shot 2019-09-14 at 11.14.02 AM.png
National Foam / Treeker Abu Dhabi
2016
Screen Shot 2019-09-14 at 11.14.02 AM.png
Phillips 66 Lake Charles La.
2013
bottom of page